Colocation pricing is set by power more than by space. Providers quote per U, per quarter, half or full rack, or per cage, but the number that decides the margin is the kilowatts each customer may draw and what a kW costs you once cooling losses are added. Price committed power first, add a space fee, then charge separately for cross-connects, remote hands, IP addresses and bandwidth.
This guide is for operators setting colocation prices. Market rates vary widely by city, power cost and facility tier, so instead of quoting other providers' prices we show how to build your own from your costs. Every figure in the examples is illustrative, not a market price.
What are the common colocation pricing models?
| Model | What the customer buys | Typical buyer | Watch out for |
| Per U | 1U to a few U with a fixed power allowance, often in amps | Single servers, small businesses | Allowances set too high for the space sold |
| Quarter, half or full rack | A lockable rack or partition with a committed kW | Small hosts, SaaS companies, ISPs | Selling a full rack at a power level your cooling cannot serve |
| Cage or suite | Several racks in a private area, priced per kW | Larger hosts and enterprises | Long contracts with fixed prices while your energy price moves |
| Per committed kW | A reserved amount of power; space bundled or priced separately | High-density and GPU customers | Customers drawing above commit with no overage clause |
| Metered power | Measured kWh at a published rate, plus a space or rack fee | Customers who want to pay for what they use | Needs per-circuit metering you can defend in a dispute |
Our posts on kW commit vs metered power billing and billing space, power, cross-connects and remote hands cover how each model is invoiced. This one covers how to set the price.
How do you calculate the cost of a kW?
A committed kilowatt costs you more than the energy the customer's servers draw, because the facility spends extra energy on cooling and losses, measured as PUE (power usage effectiveness). The steps:
- Hours in a month: use 730 as an average.
- IT energy for 1 kW running all month: 1 kW × 730 h = 730 kWh.
- Facility energy: multiply by your PUE. At a PUE of 1.5, 730 × 1.5 = 1,095 kWh.
- Energy cost: multiply by your all-in price per kWh, including network and capacity charges.
- Utilisation: customers rarely draw their full commit, which is your margin on committed power and your risk on metered power. Price committed power at the full commit.
Example inputs, not market data: at €0.20 per kWh and a PUE of 1.5, one committed kW costs 1,095 × €0.20 = €219 a month in energy. At €0.12 per kWh it is €131.40. That is before rent, cooling plant, UPS and generator maintenance, staff or margin, which is why the energy line alone can be most of a colocation bill.
How do you build a colocation price from cost?
Build each product as a stack of costs per month, then add margin. An illustrative full rack with a 4 kW commit:
| Cost line (example inputs) | Basis | Per month |
| Energy | 4 kW × €219 (from the example above) | €876 |
| Space | Your floor cost per rack position, including rent and fit-out written off over its life | €250 |
| Power and cooling infrastructure | UPS, generator, cooling maintenance and replacement reserve per kW | €160 |
| Operations | Staff, security, monitoring and insurance shared across racks | €150 |
| Cost floor | | €1,436 |
| Price at a 30% gross margin | €1,436 ÷ 0.70 | €2,051 |
Your numbers will differ, often a lot. The point is the shape: if energy is 60% of cost, a 20% rise in your energy contract moves your cost floor by 12%, so your contracts need a way to pass it through. The same cost-floor method for servers is in our guide to pricing dedicated servers.
How should space and power be split in the price?
Two common approaches:
- Bundled: one price per rack that includes a power allowance, with extra kW sold as an add-on. Easy to compare and to sell, but you must cap the allowance or a customer can fill a cheap rack with dense GPUs.
- Unbundled: a space fee plus a price per committed kW. Fairer as density rises and easier to adjust when energy prices move, because you change one line instead of every rack price.
Whichever you choose, write the power allowance into the contract as kW or as amps at a stated voltage, and say what happens above it: an overage rate, a mandatory upgrade or breaker limits. Also set your rack power budget below what the cooling and the circuits can actually deliver, and never sell past it.
What should you charge for colocation add-ons?
- Cross-connects: a one-time install fee plus a monthly fee per connection, priced by type (copper, single-mode or multimode fibre).
- Remote hands: per hour or per 15 or 30 minutes, with a minimum, a higher out-of-hours rate and optional prepaid bundles.
- IP addresses: per IPv4 address or per subnet, monthly. IPv4 is scarce and should carry a real price; IPv6 can be included.
- Bandwidth: a committed rate with burst billed at the 95th percentile, flat unmetered ports, or a per-TB allowance. Our 95th percentile billing page includes a calculator.
- Setup: a one-time installation fee covering racking, cabling and the first power-on.
- Extras: KVM-over-IP, storage space, shipping and receiving, and A+B redundant power feeds.
What contract terms protect your colocation margin?
- Term and notice: 12 to 36 months is common for racks; month-to-month suits per-U customers. Longer terms earn a discount.
- Energy pass-through or indexation: a clause that lets the power price follow your energy contract, with notice.
- Power overage: the rate for draw above the commit, how it is measured and how often.
- Deposit: one or two months for new customers without a track record.
- SLA: what is guaranteed (power, network, environment), how credits are calculated and the cap on credits.
- Overdue steps: when access badges are suspended, when power or network is cut, and what restoring costs.
Onboarding is where many of these terms are first tested; our post on colocation onboarding from quote to racked covers that step.
How do you quote a custom colocation deal?
Larger customers rarely buy from the price list. A repeatable quoting process keeps custom deals above your cost floor:
- Collect the requirement: number of racks or U, committed kW per rack, A+B feeds, cross-connects, bandwidth, IP addresses and contract term.
- Check capacity first: power and cooling headroom in the room, not only free racks.
- Price each line from your cost model, then apply the term discount, not a discount on the total.
- Add one-time fees: installation, cabling and any build-out such as a cage.
- Write the assumptions into the quote: the energy price and PUE it assumes, the overage rate and the indexation clause.
- Set an expiry date of a few weeks, because energy prices and capacity both move.
How does FluxBilling handle colocation pricing?
FluxBilling is billing and automation software for hosting providers with DCIM included. For a colocation price list it supports:
- Colocation products with rack units and committed kW on each product.
- Rack placement with a power check. When an order is paid, FluxBilling reserves a block of U in a rack at the right location and refuses any rack the order would push past its power budget, telling staff to place it by hand when nothing fits.
- Add-ons with quantities for extra kW, extra U and cross-connects, billed on every renewal, each raising a task for staff to deliver.
- Setup fees, deposits as prepaid credit, and one consolidated invoice per customer per month.
- IPAM for the addresses you sell, and PDU polling over SNMP showing each PDU's current total load.
Its limits for colocation pricing: it does not meter kWh or keep power history, so metered power is billed from your own meter readings as invoice lines; overage on committed power is not calculated automatically; and SLA credits are applied by staff. See the colocation billing software page. Plans start at €4.95 a month ($5.95 for US accounts), with DCIM included and a 14-day refund.
Questions people ask
How is colocation priced?
Per U, per quarter, half or full rack, per cage, or per committed kW, usually with power as the largest part of the price. Cross-connects, remote hands, IP addresses, bandwidth and setup are charged separately.
How do I calculate colocation power cost?
Multiply committed kW by 730 hours, then by your PUE, then by your all-in price per kWh. At a PUE of 1.5 and €0.20 per kWh, one kW costs €219 a month in energy before any other costs.
Should colocation power be billed per kW or per kWh?
Per committed kW is simpler and protects your margin; per measured kWh is fairer to customers but needs metering per circuit with history. Many providers sell committed kW with an overage rate.
What is a good margin on colocation?
It depends on your facility and market, so build the price from your own cost floor. Keep the energy part adjustable, because it is the cost most likely to move during a contract.
All figures in this article are illustrative examples built from stated inputs, not market prices or quotes from any provider.